S-34.1, r. 2 - Regulation respecting petroleum exploration, production and storage on land

Full text
303. The authorization holder must verify daily the blowout prevention system to make sure it works well. If a system component is defective, work must be suspended until the component is repaired.
O.C. 1252-2018, s. 303.
In force: 2018-09-20
303. The authorization holder must verify daily the blowout prevention system to make sure it works well. If a system component is defective, work must be suspended until the component is repaired.
O.C. 1252-2018, s. 303.